Securing The Burner To The Boiler - Riello RX 1800 S/E Installation, Use And Maintenance Instructions

Premix gas burners, progressive two-stage or modulating operation with pilot flame ignition
Table of Contents

Advertisement

5.6

Securing the burner to the boiler

Prepare a suitable lifting system using the rings
3)(Fig. 19), after removing the fixing screws 7) of
the casing 8).
 Prepare a suitable lifting system using the rings 3)(Fig. 191)
of the head assembly.
 Check the correct positioning of the insulating gasket 6
6)(Fig. 18); the black side must be faced the burner flange
and the white one to the boiler side.
 Insert the head assembly on the previously prepared boiler
hole (Fig. 19) and fix with the M18 screws.
 Remove the rings 3) from the head assembly 1).
 Lift the burner by means of the rings 3)(Fig. 19) after having
removed the cover 8) fixing screws 7)(Fig. 20).
 Fix the burner onto the head assembly with the supplied
screws 5)(Fig. 19).
The seal between burner and boiler must be
airtight.
ATTENTION
20129398
20152087
6
8
7
20122782
Installation
3
Fig. 18
3
3
24
GB
1
3
5
3
3
20122779
4
A
B
Fig. 19
Fig. 20

Advertisement

Table of Contents
loading

Table of Contents