WARNING:
To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment.
Install the device in an area that meets the following safety requirements:
•
Near a properly grounded AC power outlet.
•
In a temperature-controlled room with a continuous temperature range from 0°C to 40°C (32°F to 104°F).
•
In a dry, clean, and well-ventilated room away from heat sources such as hot air vents or direct sunlight
•
Away from severe electromagnetic noise
•
Away from direct view within the workplace
The numbers one through four in the following figure correspond to the setup procedure:
1. Connect the power adapter to the AC power outlet. These power modules are 1+1 redundant power supplies.
NOTE:
Connect the device to a properly wired earth-ground AC power outlet.
2. Connect one of the default WAN ports (GE3-6 or SFP1-4) to an available Internet connection. SFP modules are not included.
3. If you received an email from your IT administrator, follow the instructions in the email to complete the Edge activation.
4. Connect local devices such as computers and switches to the GE1 or GE2 ports.
NOTE:
The RJ45 ports on the left side of the box are for console/administration access only.
20
Platform setup
Platform setup
5