6. EtherCAT Connection Procedure
This section describes the procedure for connecting the Controller with the Slave via
EtherCAT. The description assumes that the Controller is set to factory default.
6.1. Workflow
Take the following steps to operate the PDO communications via EtherCAT after connecting
the Controller with the Slave via EtherCAT.
6.2 EtherCAT Coupler Unit Settings
6.2.1 Creation of a New Project
6.2.2 Network Configuration Settings
6.2.3 I/O Map Settings
6.2.4 Safety I/O Function Settings
0
Creation of Safety Programs
6.2.6 Transfer via Connection to the Communications
Coupler Unit
6.2.7 Output of Couple I/O Allocations
6.2.8 Changing to DEBUG Mode
6.2.9 Performing Safety Validation
6.2.10 Changing to RUN Mode
6.3 Preparation for the Controller Setup
6.3.1 Creation of a New Project
6.3.2 Initial Settings of the Controller
10
▼
▼
▼
▼
▼
▼
▼
▼
▼
▼
▽
▼
▼
▽
Prepare to set the EtherCAT
Coupler Unit.
Prepare the Controller settings.