Yale HOISTS SHAW-BOX YKA Operation & Service Manual page 62

Wire rope hoists
Table of Contents

Advertisement

4
Installation
62
Dimensions "a", "b", "c" assignment
Flange width
Reeving
[in]
3.2
4.7
6.7
11.8
15.7
19.7
31.5
3.2
2PS
4.7
6.7
11.8
15.7
19.7
31.5
3.2
4.7
6.7
4PS
11.8
15.7
19.7
31.5
Dimensions for shortened C-profile
1)
Arrangement of the mounting positions (KE-S65)
Type
Reeving
YKC/SKC
Drum pull force
≤ 2500 daN
2PS
YKC/SKC
Drum pull force
> 2500 daN
YKC/SKC
Drum pull force
≤ 2500 daN
4PS
YKC/SKC
Drum pull force
> 2500 daN
Drum length
Remark
L2 + L3
L2 + L3
L2 + L3
L2 + L3
L2 + L3
L2 + L3
L2 + L3
L4
L4
L4
L4
L4
L4
Shorten the
L4
C-profile to
26 in
L2 + L3 + L4
L2 + L3 + L4
L2 + L3 + L4
L2 + L3 + L4
L2 + L3 + L4
L2 + L3 + L4
L2 + L3 + L4
Flange width
Drum length
[in]
4.7 – 13.8
L2 + L3
13.8 – 31.5
L2 + L3
4.7 – 19.7
L4
19.7 – 31.5
L4
4.7 – 13.8
L2 + L3
13.8 – 31.5
L2 + L3
4.7 – 19.7
L2 + L3 + L4
19.7 – 31.5
L2 + L3 + L4
4.7 – 19.7
L2
19.7 – 31.5
L2
4.7 – 19.7
L3
19.7 – 31.5
L3
a
b
c
[in]
[in]
[in]
6.38
4.76
+2.36
6.38
4.76
+2.36
6.38
4.76
+2.36
6.97
0.67
-3.9
2.24
0.67
-8.62
7.05
0.65
-13.43
4.69
0.63
-27.6
6.38
3.78
+1.38
6.38
4.37
+1.97
6.38
4.76
+2.36
6.38
3.19
+0.79
4.61
0.67
-3.9
4.61
0.67
-8.62
9.33
0.71
−22.8
1)
1)
*1
6.38
4.76
2.36
6.38
4.76
2.36
6.38
4.76
2.36
6.38
3.58
1.18
6.97
1.06
-3.5
2.24
1.06
-8.23
9.33
1.1
-22.4
Assembly
position
3
4
3
4
3
4
3
4
1
2
3
4
07.2020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents