Arrangement of the mounting positions
Type
YKE/SKE
YKD/SKD
Observe the mounting position of the screws (2).
Fasten the "PLS" (1) switching unit on at the prescribed position with the bolted
connections, see figures above.
Tighten the bolted connections with the prescribed tightening torque (12 Nm).
Perform a functional test, see the Performing a functional test section
Reeving
Drum length
2PS
L2 + L3 + L4 + L5
4PS
L2 + L3 + L4 + L5
2PS
L2
2PS
L3 + L4 + L5
4PS
L2 + L3 + L4 + L5
Assembly position
2
1
2
3
1