Yale HOISTS SHAW-BOX YKA Operation & Service Manual page 55

Wire rope hoists
Table of Contents

Advertisement

4
Installation
Drum length L2
Drum length L3
Drum length L4
(3) Mounting holes
07.2020
Mounting holes on the lifting beam
Reeving
2PS
4PS
Fasten the "PLS" (1) switching unit on at the prescribed position with the bolted
connections, see figures above.
Tighten the bolted connections with the prescribed tightening torque (12 Nm).
Perform a functional test, see the Performing a functional test section.
Assembly position
1
2
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents