7
Inspection and maintenance
Dim.
[in]
50 Hz
60 Hz
1PS
5.1
5.9
1PD
a
*1
2PS
2.8
3.1
2PD
4PS
1.6
2
4PD
b = V × t × 0.023 ft
V = Hoist speed [fpm]
t = Brake ramp [s]
(Factory setting = 1.5 s
b
Example:
YKC/SKC-L05-...S264-V
b = 64 × 1.5 × 0.023 = 2.2 ft
c
2.4
*1
d
4.7
e
Effective hook path
With the option hook operated hoist limit
*1
switch (see section 4.11),
dimension "a" increases by 3.9 in,
dimension "c" increases in accordance with
the table.
Type
Dimension "c"
YKA/SKA, YKB/SKB
YKC/SKC, YKE/SKE
YKD/SKD
07.2020
Adjusting operational hoist limit switching, "bottom" (B)
Actuate the DOWN-button in the control pendant with caution.
Lower the load hook to 0.39 in in front of the switching point (observe the minimum
distance "d").
– If the operational hoist limit switch should switch off beforehand, turn the
Turn the adjustment screw "S6" clockwise until the switch contact latches audibly.
Actuate the UP-button in the control pendant.
– The "bottom" operational hoist limit switching position has been set.
Reeving
1
2
4
)
enlargement
[in]
2
3.9
5.9
Adjusting emergency hoist limit switching, "bottom" (A)
The "bottom" operational hoist limit switching position must be set.
Actuate the DOWN button in the control pendant with caution.
Observe the hoisting movement, until operational hoist limit switching (B) switches
off in the bottom hook position.
adjustment screw "S6" anticlockwise 1 revolution and repeat step 2.
123