Installation Guide; Overview Steps; Mechanical Installation Steps - Acuva STRIKE I Product Manual

Uv-led water disinfection module
Table of Contents

Advertisement

Installation Guide

Overview Steps

1.
2.
3.
4.

Mechanical Installation Steps

MECHANICAL MOUNTING
Strike modules require proper orientation to entirely flood the reactor and
prevent air pocket from becoming trapped in the module. The module can
be mounted in either vertical or horizontal orientations according to
Advanced UV-LED Water Purification |
Mount unit in desired position for integration. See section
Mechanical Mounting
Connect the water inlet/outlet lines using proper fittings. See details
in section pluMbing. Ensure fittings do
not leak at operating pressures—water leaks can damage the Strike units.
Connect the electrical connectors (4-pin connector from each side) to
a proper interface.
For electrical integrations using Acuva control PCBA 600-0213 see
section
installation with acuva supplied control
For installation direct in OEM equipment please, see section
installation direct into oeM
Flush UV module at rated flow rate for several minutes to ensure
water entirely floods the disinfection unit.
acuvatech.com
Strike I and II UV-LED Water Disinfection Module
for details.
product.
P R O D U C T M A N U A L
pcba.
Figure
4.
Page 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strike ii

Table of Contents