Acuva STRIKE I Product Manual page 12

Uv-led water disinfection module
Table of Contents

Advertisement

Strike I and II UV-LED Water Disinfection Module
P R O D U C T M A N U A L
Installation Guide
Electrical Installation Steps Cont'd
INSTALLATION WITH ACUVA SUPPLIED CONTROL PCBA CONT'D
Power Supply
On/Off Switch or
Flow Switch
Water Out
Acuva Interface PCB
Water In
Figure 7: Strike I integrated with control PCBA block diagram
Figure 8: Strike I integrated with control PCBA
On/Off Switch or
Flow Switch
Water In
Water Out
Acuva
Interface PCB
Power Supply
Figure 9: Strike II integrated with control PCBA
Figure 10: Strike II integrated with control PCBA
block diagram
Advanced UV-LED Water Purification |
acuvatech.com
Page 12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strike ii

Table of Contents