Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Summary This document is the product manual for the Strike I and II product family, including safety, product specification, installation and maintenance information...
PoU applications and OEM integration. Strike I and II modules are factory configurable for a range of flow, disinfection and lifetime specifications. This manual outlines mechanical and electrical interfaces and installation requirements for the Strike I and Strike II family of products.
Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Input Water Quality and Environmental Requirements The quality of the input water is important as it influences the effectiveness of the system and the drinking water safety of the disinfected output water.
(Electrical cable length not drawn to scale). Figure 1: Strike I disinfection module mechanical envelope The Strike I module includes a 3/8” NPT female thread on the water input and a ¼” NPT female on water outlet. The Strike II envelope includes two electronics/optics heads joined by a reactor tube.
Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Product Information Strike Electrical Characteristics The Strike modules electrically interfaces via a 4-wire terminated connector protected with an outer PVC jacket. See...
Page 7
Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Product Information Strike Electrical Characteristics Cont’d Condition Value Unit Max. Input Voltage Min. Input Voltage Max. Current Draw vcc = 12v Min.
Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Installation Guide Overview Steps Mount unit in desired position for integration. See section Mechanical Mounting for details. Connect the water inlet/outlet lines using proper fittings. See details in section pluMbing.
Page 9
Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Installation Guide Mechanical Installation Steps Cont’d MECHANICAL MOUNTING CONT’D Figure 4: Recommended mounting of Strike modules Equivalently, it is important to avoid mounting orientations that can possibly trap air bubbles in the Strike systems.
Page 10
Strike I and II UV-LED Water Disinfection Module P R O D U C T M A N U A L Installation Guide Mechanical Installation Steps Cont’d MECHANICAL MOUNTING CONT’D Figure 6: Incorrect mechanical mounting of Strike modules Advanced UV-LED Water Purification | acuvatech.com...
As the Strike I & II UV-LED modules can disinfect on demand, a triggering mechanism is needed to toggle the enable pin of the Strike electronics to activate the LED when water begins to flow. As well, the user may find it beneficial to add visual health indicators or an audio buzzer to signal the health or error of the system.
Page 12
Power Supply On/Off Switch or Flow Switch Water Out Acuva Interface PCB Water In Figure 7: Strike I integrated with control PCBA block diagram Figure 8: Strike I integrated with control PCBA On/Off Switch or Flow Switch Water In Water Out...
LED2 Coloured LED Lit when UV LED is in a fault condition table 5: Recommended components list for Strike I integration circuit. table 6 indicates the behavior of the LED health indication output of the application circuit as a function of other conditions.