Electrical Installation Steps; Installation With Acuva Supplied Control Pcba - Acuva STRIKE I Product Manual

Uv-led water disinfection module
Table of Contents

Advertisement

Strike I and II UV-LED Water Disinfection Module
P R O D U C T M A N U A L
Installation Guide

Electrical Installation Steps

INSTALLATION WITH ACUVA SUPPLIED CONTROL PCBA

Acuva strongly recommends interfacing the Strike modules electrically with
an Acuva control PCBA part number 600-0213. Integration in this manner
assures the user of easiest, trouble-free deployment of the Strike module as
the Acuva designed control PCBA provides proper power provisioning, signal
protection and easiest access via on-PCBA connectors to access indication
signals.
As the Strike I & II UV-LED modules can disinfect on demand, a triggering
mechanism is needed to toggle the enable pin of the Strike electronics to
activate the LED when water begins to flow. As well, the user may find it
beneficial to add visual health indicators or an audio buzzer to signal the
health or error of the system. Paired with a connectorized flow switch the
user is quickly able on/off functionality and visual or audio indications.
Figure 7
through
Figure 10
indicated block diagrams and photographs of
the Strike and control PCBA integrations.
Acuva control PCBA 600-0213 operates with Strike I or Strike II module. See
If required, request specification sheet document 600-0213SP_REVXX.pdf
from Acuva technologies for details of this part.
see next page For diagraMs
Advanced UV-LED Water Purification |
acuvatech.com
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strike ii

Table of Contents