Installation

Locate and Secure the Machine
1.
a. Move the machine to a desired location.
b. Install the feet onto the base.
c. Level the machine by adjusting the height of the
feet.
Connect the Air Source
2.
a. Connect air to the air assembly.
332078C
Ground the System.
3.
The equipment must be grounded to reduce the risk
of static sparking. Static sparking can cause fumes
to ignite or explode. Grounding provides an escape
wire for the electric current.
a. 633: grounded through power cord. The
machine is shipped with a North American style,
3 prong, 120 VAC plug.
b. Dispense Valve: follow your local code.
c. Fluid Supply Containers: follow your local code.
d. Dispensing target/container: follow your local
code.
e. To maintain grounding continuity when flushing
or relieving pressure, hold a grounded metal
pail firmly to a metal part of the dispense valve,
then initiate dispense.
Connect the Screw Rotate Signal.
4.
a. Refer to Schematics, page 46, for screw rotate
signal connections.
NOTE: The screw rotate signal tells the machine when
to dispense material.