Dual Back-To-Back Charging Station Installation - Flo CoRe+ Installation Manual

Cable management system and pedestal
Hide thumbs Also See for CoRe+:
Table of Contents

Advertisement

Dual back-to-back charging
station installation
Cable management system columns and cable clamp
Top mounting brackets
Round spacing shims
Rectangular spacing shims
Self-adhesive rubber band
¼-20 screws (1'') (for pre-drilled pedestal)
Self-drilling screws (1'') (for pedestal with no holes)
Drilling template
Drilling template (bottom pedestal)
IF THE PEDESTAL IS NOT PRE-DRILLED, USE THE FOLLOWING DRILLING TEMPLATES:
Top Drilling template
MEC-CST-00280
Included material
Bottom Drilling template
MEC-CST-00278
Cable management system and pedestal installation guide
Qty
2
2
2
2
2
6
6
1
1
10
CoRe+
TM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CoRe+ and is the answer not in the manual?

This manual is also suitable for:

Core+ co-pe-000002

Table of Contents