Installation; Mechanical Connection; Load Hook And Chains; Adjustmentsadjustments - probst SRG Series Operating Instructions Manual

Manhole and cone chain clamp
Table of Contents

Advertisement

Operating Instructions
SRG-1,5/SRG-3/SRG-3-L

4 Installation

4.1

Mechanical connection

4.2

Load hook and chains

Fit suspension ring in the load hook of the lifting equipment/carrier.
Ensure that the single chains are not twisted and may be easily pulled through the jaws
Attaching the device to the lifting equipment take care that all local safety regulation is observed.
It is not allowed to exceed the carrying capacity of the lifting equipment with the device and the maximum
load.

5 AdjustmentsAdjustments

5.1.1

Adjustment to suit the Pipe Outside Diameter

When leaving the factory the chains are adjusted to the maximum length.
If the chains are too long (in case of a lower construction height) release
bolts .
Adjust all chains to the same length and secure chains . The inclination
angle must not exceed 45° : Danger of releasing the load !
10 /17
Installation
Fig. 1
V3
Fig. 2
GB