This hardware unit may malfunction if it is connected poorly or has a broken
line. After connecting the 10BASE-5 connector, check whether the locking
post is locked by the retainer.
Do not touch the 10BASE-5 connector during power-on. Otherwise, the
system may malfunction due to static electricity, etc.
(chapter 3, page 3-6)
The following 12 VDC external power supply is recommended. Use the
recommended power supply.
Power supply model name: HK-25A-12 (manufacturer: Densei-Lambda K.K.)
When the two ET.NET modules LQE020 and LQE520 are installed, no
SV.LINK module can be installed.
When ET.NET module LQE720 is installed, no SV.LINK module can be
installed.
When mounting the SV.LINK module and ET.NET module on the same mount
base, perform setup so that the main module and submodule are distinctively
defined.
Example: If the ET.NET module is defined as the main module, be sure to
define the SV.LINK module as the submodule. If the ET.NET
module is defined as the submodule, be sure to define the SV.LINK
module as the main module.
A total of up to two modules (ET.NET and SV.LINK modules) can be mounted
on the same mount base.
Even if no ET.NET module is installed, you can mount only one SV.LINK
module.