Unpacking And Checking - Huawei UPS2000-A Series User Manual

Table of Contents

Advertisement

UPS2000-A-(6 kVA-10 kVA)
User Manual
Model
10 kVA
professional
version with
long backup
time

3.1.4 Unpacking and Checking

Figure 3-3
Figure 3-3 Transportation safety requirements
Issue 05 (2019-12-19)
Wiring
Termin
al
Input
Output
Battery
If customers purchase input and output power cables by themselves, use the cables that comply with
standards proposed by Underwriters Laboratories (UL) or International Electrotechnical Commission
(IEC).
shows the transportation safety requirements.
Copyright © Huawei Technologies Co., Ltd.
Rated
External
Voltage
Circuit
Breaker
208 V
63 A
AC, 220
(feature
V AC,
D)
230 V
63 A
AC, or
(feature
240 V
D)
AC
240 V
63 A
DC
ELCB
Cross-se
Termi
ctional
nal
Area
Type
2
100
10 mm
OT-10
mA
mm
M6
termin
N/A
al
2
N/A
10 mm
3 Installation
Torqu
e for
Tighte
ning
Bolts
2.8
2
-
N.m
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents