Installation planning
It's recommended to plan the installation in order to ensure that all
components in the system are properly specified. The planning stage should
include the following tasks:
•
Make a plan of the site and specify suitable locations for the devices
•
Consider power budget
•
Specify cabling and connections (for example whether devices will be
"daisy-chained" or not)
•
Specify cable glands that will be needed for the various devices
•
Specify location of terminators on the Tankbus (Rosemount 2410 Tank
Hub)
•
Make a note of identification codes such as Unit ID/Device ID of each
device
•
Assign communication addresses for level gauges and other tank devices
to be stored in the Tank Databases
Hub and Rosemount 2410 Tank Hub
See
Electrical installation
See the Rosemount Tank Gauging
(1)
00809-0300-5100) and the Rosemount 2410 Tank Hub
(Document no. 00809-0100-2410) for more information.
Quick Start Guide
(1)
of the Rosemount 2460 System
for more information on cables and glands.
System Configuration Manual
Quick Start Guide
(Document no.
Reference Manual
13