Dura Trel GRAPEVINE TRELLIS Assembly Instructions

Advertisement

TOOLS NEEDED

Drill with #2 Phillips drill bit or
Phillips Screwdriver
Super or Crazy Glue
Hammer or Mallet

TRELLIS ASSEMBLY

(Refer to Drawing 1)
On clean flat surface lay both of the trellis legs so pilot holes for screws are facing up and routed
holes for cross rails are facing each other. Take one of the top/bottom rails and the center rail and
insert the rails into the routed holes on legs. Next slide the 5 tubes through the center rail and into
the bottom rail that you just inserted into the trellis legs. Insert the top cross rail into one leg, then
slide tube ends into the holes as you bring the top rail down to insert it into the other leg. Make
sure cross rails are inserted completely into both legs and fasten with screws. Snap screw caps over
screw heads. Place the 7/8 x 1 ½" end caps on top legs. Household glue may be used if caps are
loose.

INSTALLATION

In desired location set the trellis in place and mark where ground anchors will need to be inserted.
Using a block of wood to protect the flared edges of ground anchors; pound the anchors into place.
(If ground is extremely hard, loosen or soak soil before inserting ground anchors). Set trellis into
ground anchors.
If you encounter missing or defective parts, please contact manufacturer direct at
Dura-Trel, Inc. ~ PO Box 122, Sheboygan Falls, WI 53085 ~ Toll Free 877-258-6020
ASSEMBLY INSTRUCTIONS
toll free # below.
G
T
RAPEVINE
RELLIS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GRAPEVINE TRELLIS and is the answer not in the manual?

Questions and answers

Summary of Contents for Dura Trel GRAPEVINE TRELLIS

  • Page 1 RAPEVINE RELLIS ASSEMBLY INSTRUCTIONS TOOLS NEEDED Drill with #2 Phillips drill bit or Phillips Screwdriver Super or Crazy Glue Hammer or Mallet TRELLIS ASSEMBLY (Refer to Drawing 1) On clean flat surface lay both of the trellis legs so pilot holes for screws are facing up and routed holes for cross rails are facing each other.
  • Page 3 PACKING LIST #11105 rapevine rellis PARTS CONTAINED: QTY. PART NO. PART DESCRIPTION 47815-59500 ⅞ x 1½ x 59½” LEG 47815-28002 ⅞ x 1½ x 28” TOP/BOTTOM RAIL (holes in 1 side) 47815-28003 ⅞ x 1½ x 28” CENTER RAIL (holes in 2 sides) 60058-53000 ⅝...

Table of Contents