Assembling - Makita DTD152 Technical Information

Hide thumbs Also See for DTD152:
Table of Contents

Advertisement

3.3.1.2. ASSEMBLING

(22)
(28)
(26)
(27)
Groove of Bearing box
complete (28)
(28)
Figure 10
(8-16)
Stopper portion
(17-25)
(26)
Projection of Internal
gear 51 (26)
Figure 11
1. Put O ring 40 (27) into the groove of Bearing box
complete (28).
2. Put the small diameter portion of Internal gear 51 (26)
on O ring 40 (27) in Bearing box complete (28).
3. While engaging Spur gear 22 (22) with Internal gear 51
(26), set Hammer section (17-25) in place.
4. Align the stopper portion of Hammer case complete
section (8-16) with either one of the 4 projections of
Internal Gear 51 (26), then put Hammer case complete
section (8-16) on Bearing box complete (28).
July 2015
9 / 27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents