Makita DTD152 Technical Information page 14

Hide thumbs Also See for DTD152:
Table of Contents

Advertisement

Notch of Yoke unit (29)
(29-33)
Projection
Figure 24
(A)
Flat portion of Brush
(29)
holder complete (32)
(C)
(36)
Figure 25
Projection of Hammer case
complete (13)
(8-28)
(36)
Groove
(B)
(32)
6. Mount Hammer case section (8-28) and Motor section
(29-33) to Housing L (36) while checking the following
points:
- align the notch of Yoke unit (29) with the projection of
Housing L (36)
- align the projection of Hammer case complete (13) with
the groove of Housing L (36)
7. Check the followings to make sure that Brush holder
complete (32) and Yoke unit (29) are properly mounted to
Housing L (36):
(A) The flat portion of Brush holder complete (32) must be
vertical against Housing L (36).
(B) After setting Yoke unit (29) to Housing L (36), fit the side
of Yoke unit (29) to the rib of Housing L (36).
(C) After setting Yoke unit (29) to Housing L (36), fit the side
of Brush holder complete (32) to the rib of Housing L
(36).
July 2015
14 / 27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents