Performance Verification - Fluke 80i-110s User Manual

Ac/dc current probe
Hide thumbs Also See for 80i-110s:
Table of Contents

Advertisement

16

PERFORMANCE VERIFICATION

Verify probe accuracy with the test setups shown in Figure 5. Required test
equipment is defined in Table 1. Toroid coil construction is illustrated in Figure 6.
Do the following to verify the probe accuracy:
1. Set up Connection A.
2. Make the checks called for in Table 2.
3. Disconnect Connection A at the 5100B.
4. Set up Connection B
5. Make the checks called for in Table 3.
Table 1. Required Test Equipment
REQUIRED
AC/DC Calibrator
Transconductance Amplifier
Digital Multimeter (DMM)
Small insulated screwdriver
Banana-to-BNC Adapter
10-Turn Toroid Coil
80i-110s Instruction Manual
RECOMMENDED MODEL
Fluke Model 5100B
Fluke Model 5220A
Fluke Model 8050A
Spectrol
Fluke Model PM9081/001
(see Figure 6.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents