I N S T A L L A T I O N M A N U A L
Tools required for assembly and installation of X-Stream 2 slide:
NOTE: USE PROVIDED ANTI-SEIZE ON ALL BOLTS!
1.
2.
3.
4.
5.
6.
7.
8.
9.
Note: Use slide box and packaging during assembly to protect slide components from
damage from the decking surface.
ASSEMBLY AND INSTALLATION INSTRUCTIONS
For left turn slides, flume A–B is the upper flume and C–D is the lower flume, in that order.
For right turn slides, flume C–D is the upper flume and A–B is the lower.
XS2-IM Rev. 10/14 (SBK-XS2 INSTALL)
LIST OF REQUIRED TOOLS
Hammer
3/8" drive ratchet
3/8" x 6" ratchet extension
1/2" deep socket (deep socket is necessary)
9/16" socket
9/16" box end ratchet wrench
Drill with 3/8" masonry bit
Tape measure
PVC Pipe Cutter
X - S T R E A M 2 ™ S L I D E
Fig. 1
8
Need help?
Do you have a question about the X-STREAM 2 SLIDE and is the answer not in the manual?
Questions and answers