Industrial Dynamics Company, Ltd. Document 40274-0600
3. Center a properly filled and sealed production container in the
inspection tunnel so that when the sensor mounting bracket is
lowered, it is aligned with the Trigger Beam.
4. Lower the bracket until the Trigger Beam contacts the container
at the widest part of the lid, or if the container is oriented
upside down so the beam contacts the container as shown in
Figure 2-11.
5. Tighten the height locking handle to secure the Trigger Beam
positioning.
6. If you will not be performing further alignment procedures,
reactivate the X-ray Generator. For more information see "The
Safety Interlock Switch" on page 2-4.
Chapter 2: Operating Your FT-70/75
2-23