Download Print this page

Filtec FT-50 Installation And Setup Manual

Downstream inspection station
Hide thumbs Also See for FT-50:

Advertisement

Downstream Inspection
Station
Installation and Setup Guide for
Models FT-50 and FT-70
2516-1092

Advertisement

loading
Need help?

Need help?

Do you have a question about the FT-50 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Filtec FT-50

  • Page 1 Downstream Inspection Station Installation and Setup Guide for Models FT-50 and FT-70 2516-1092...
  • Page 2 Downstream Inspection Station Installation and Setup Guide for Models FT-50 and FT-70 Document 2516-1092...
  • Page 3: Contact Information

    Industrial Dynamics Company, Ltd.   Filtec and Industrial Dynamics are registered trademarks of Industrial Dynamics Company, Ltd. All other trademarks are the property of their respective owners.
  • Page 4 Multiple Body Label the Same Station Front and Back Labels or Single Label Quad Beam Detector When multiple Downstream Inspection Station Mounting Stands are used with the same FT-50/70 Inspection System, the stand closest to Inspection Head will be designated Station the FT-50/70 etc.
  • Page 5 The Electronics Enclosure (Junction Box) houses the amplifiers and other electronics for the inspection devices assigned station and interfaces the devices to the FT-50/70 Inspection Head through a single multi-conductor cable. Figure 1 illustrates a station where sensors are placed on both sides of the conveyor.
  • Page 6 FT-50/70 System it is being used performed the same with. Refer to the installation instructions in the FT-50/70 Service Manual before installing the station. The Downstream Inspection Station with the applicable sensors operating mounted in their approximate...
  • Page 7 lnstallation lnstructions 1. Remove guide rails on both sides conveyor and level conveyor both across and parallel to chain. 2. Assemble Tripod Floor Mount (11287) using four 3/8-16 1" hex head bolts with flat and lock washers. Leave bolts loose for later adjustment.
  • Page 8 13.5 inches from the centerline of the conveyor chain and the correct distance downstream from the centerline of the FT-50/70 Inspection Trigger. The station is positioned downstream of the Inspection Head but before the Rejector. The Rejector can be up to 32 container diameters downstream of the Inspection Trigger.
  • Page 9: Alignment Procedures

    After welding, remove the pipe clamp and discard. 9. Connect the cable from the station Junction Box to the FT-50/70 Inspection Head. Route the multi-conductor cable through watertight cable connector in the bottom of the Inspection Head and connect the wires to the IT-50 Main Terminal Block 22344.

This manual is also suitable for:

Ft-70