Download Print this page

Stratasys Dimension BST 768 Quick Start Manual page 5

Head clog clearing

Advertisement

Step 10:
-
Reattach the Feed Funnel
Step 11:
-
On the front of the machine run
the model motor forward
-
Feed a piece of model material
through the head
-
The material should start extruding
through the model tip after about
10 seconds
-
If material does not feed through,
repeat the previous steps
Step 12:
-
For the support side use the same
steps to detach the motor from the
head
-
Once the motor is detached, use
the ¼" Nut Driver to remove the
nut that covers the feed tube. Be
very careful not to lose this nut.
-
This nut is pictured in Step 9,
Picture 2 directly above the white
text box that reads "Feed Tube".

Advertisement

loading

This manual is also suitable for:

Dimension sst 768Dimension elite 768