INSTALLATION
Installation
9.
Installation
9.1
Heat exchanger connection
f Flush the indirect coil with water before connection.
f
9.1.1 Oxygen diffusion
Material losses
!
Avoid open vented heating systems and underfloor
heating systems with plastic pipes that are permeable
to oxygen.
In underfloor heating systems with plastic pipes that are per-
meable to oxygen and in open vented heating systems, oxygen
diffusion may lead to corrosion on the steel components of the
heating system (e.g. on the indirect coil of the DHW cylinder, on
buffer cylinders, steel radiators or steel pipes).
Material losses
!
The products of corrosion (e.g. rusty sludge) can set-
tle in the heating system components, which may re-
sult in a lower output or fault shutdowns due to reduced
cross-sections.
9.2
Installing the threaded immersion heater
(accessory) if required
Preparing the connector for the threaded immersion heater
16
| SB-VTH
Installing the HP-SB 2/040 threaded immersion heater
1
2
3
1 Sheet metal casing earth
2 Gasket
3 Heating element
4 Temperature selector
5 Control indicator
6 Flange cover
7 Washer
8 Screw
9.3
Heat generator connection versions
9.3.1 Cylinder charging via cylinder charging pump
II
2
1
A
4
2
3
B
I Heat generator
II Room heating
A Heat generator flow
B Heat generator return
C Temperature control connection
1 Shut-off valve
2 Non-return valve
3 Cylinder charging pump
4 Heating circuit pump
4
5
6
7
C
I
www.stiebel-eltron.com
8