Electrical Connection To The Terminal Strip - Riello P 140 T/G Installation, Use And Maintenance Instructions

Three-stage operation oil burners
Table of Contents

Advertisement

Available languages

Available languages

4.2 ELECTRICAL CONNECTION TO THE TERMINAL STRIP

(installer-set)
P 140 - 200 - 300 T/G
DIRECT MOTOR STARTING
(A)
P 300 - 450 T/G
STAR-DELTA MOTOR STARTING
(B)
THERMAL RELAY
(C)
Important:
Check the lock-out by darkening the
photo-cell after removal of the cover.
ATTENTION: HIGH VOLTAGE
LAYOUT (A) - Electrical connection P 140-200-300 T/G
burners with direct motor starting
D2568
230 V
F
A gG/gL
25
L
2,5
2
mm
LAYOUT (B) - Electrical connection P 300-450 T/G burners
with star-delta motor starting
KEY TO LAYOUTS (A) - (B)
I1 - Burner manual stop switch
MA - Star-delta starter terminal strip
MB - Burner terminal strip
PS - Reset push-button
S - Remote lock-out signal
TL - Load limit remote control system:
TS - Safety load control system:
D9469
T2 - 2
T3 - 3
SCHEMA (C) - Calibration of thermal relay
This is required to avoid motor burn-out in the
event of a significant increase in power
absorption caused by a missing phase.
• If it is delta-powered, 220 V, the cursor should
be positioned to "MAX".
NOTE
In systems where the run of wiring connecting
the thermostat exceeds 20 metres in length, or
in places where the burner is subject to particu-
larly disturbing electromagnetic interference
(over 10 v/m), you must insert the relay-inter-
face kit item number 3010386.
35
Cables cross-section
P 140 T/G
P 200 T/G
400 V
230 V
400 V
25
40
25
2,5
4
2,5
Cables cross-section
P 300 T/G
220 V
F
A gG/gL
50
L
6
2
mm
E
4
2
mm
shut down the burner when the boiler
temperature or pressure reaches the
maximum preset value
operateds when TL is faulty
nd
stage load control system
rd
stage load control system
P 300 T/G
230 V
400 V
63
50
6
4
P 450 T/G
220 V
63
10
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 200 t/gP 300 t/gP 450 t/g20049069

Table of Contents