Aga-Rayburn Coalbrookdale Little Wenlock Gas Power Flue Installation And Servicing Instructions page 9

Table of Contents

Advertisement

THE FLUE
DIRECT VENT INSTALLATION
1. Flue drilling point. Position of the hole through the wall
should be as Fig. 7.
2. Assemble the flue elbow flue connector and flue as
shown in Fig. 8 ensuring that the seals are in position.
3. Cut flue pipe to length ensuring that it protrudes
through the wall a minimum of 10mm.
4. Seal around hole with cement and fit cover plate and
terminal guard.
FIG. 7
FIG. 8
8
DESN 511300
DESN 511301

Advertisement

Table of Contents
loading

Table of Contents