Preparing The Machine - Toro Ultra Sonic Boom 41218 Installation Instructions Manual

Leveling kit, 2010 and after multi-pro turf sprayers and workman 200 spray system
Table of Contents

Advertisement

Procedure
6
7
8
Note: Decal 119-9431 is used with a hand-held diagnostic tool and therefore is not installed on the machine.
Note: Determine the left and right sides of the machine from the normal operating position.
1

Preparing the Machine

No Parts Required
Procedure
Position the machine on a level surface, stop the engine,
remove the ignition key, and engage the parking brake.
CAUTION
If you leave the key in the ignition switch, someone
could accidently start the engine and seriously
injure you or other bystanders.
Remove the key from the ignition switch before
install the kit.
2
Removing the Hardstops
No Parts Required
Procedure
If your machine has hardstops installed, they must be
removed before installing the Sonic Boom Kit. The
hardstops are located in the center boom of the caged
booms and can be seen when the booms are in the
upright, transport position. If your machine does not
have hardstops installed, skip to the next procedure.
Description
Decal, 94-8582
Light assembly
Rocker switch
Cable ties
Indicator light (Workman 200 only)
Grommet (Workman 200 only)
No parts required
Qty.
1
Install the indicator light.
1
1
6
Install the controls.
1
1
Calibrate the sonic booms.
1. Raise the booms into the transport position and
remove the ignition key.
2. Remove the 4 bolts (5/16 x 1 inch) and nuts (5/16
inch) that secure the stops to the center boom frame
as shown in (Figure 1).
Note: Remove the hardstop assemblies on both
sides of the center boom. Retain all parts for later
use.
1
2
3
Right side shown
1. Center boom assembly
2. Assembled bracket and
bumper
3
Use
G009415
4
Figure 1
3. Bolt (5/16 x 1 inch)
4. Nut (5/16 inch)