Installation; Preparing The Machine - Toro 41605 Installation Instructions Manual

Hand spray gun kit
Table of Contents

Advertisement

Installation

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
Note: Determine the left and right sides of the machine from the normal operating position.
Note: Thread sealing tape is used in the installation of this kit.
1

Preparing the Machine

No Parts Required
Procedure
1. Ensure that the machine is empty of all fluids. If
chemicals have been used in the machine, flush the
system thoroughly with clean water and drain the water;
refer to your vehicle Operator's Manual for instructions.
2. Disconnect the negative battery terminal from the
battery.
Description
No parts required
Hose hook
Spray-gun bracket assembly
Washer (3/8 inch)
Locknut (5/16 inch)
Carriage bolt
Manual valve assembly
Threaded rod
Locknut
Washer
Jam nut
Control box and bracket assembly
Bolt (1/4 x 5/8 inch)
Locknut (1/4 inch)
Hose
Hose clamp
Long hose with fitting
Spray gun
Hose clamp, small
Qty.
Prepare the machine.
1
1
2
Installing the hose hooks.
2
2
1
4
8
Install the valve assembly.
6
8
1
3
Install the control box.
3
1
Install the supply hose.
2
1
1
Connect the spray hose.
1
2
Installing the Hose Hook and
Spray-Gun Bracket Assembly
Parts needed for this procedure:
1
Hose hook
1
Spray-gun bracket assembly
2
Washer (3/8 inch)
2
Locknut (5/16 inch)
2
Carriage bolt
Procedure
1. Loosen the front tank strap on the right hand side
(Figure
3).
3
Use

Advertisement

Table of Contents
loading

Table of Contents