Download Print this page

Hunter TCA28 Installation Instructions Manual page 28

Advertisement

Anchoring (Optional)
1. Mark hole locations for the four feet on the tire changer.
2. Drill a 5/16 inch diameter hole four inches deep at locations previously marked.
3. Install a 5/16 inch anchor bolt into each foot securing the tire changer to the floor.
Modification Instructions for Nitrogen Tire Fill
The TCA28 can be easily modified to allow the use of nitrogen for the bead blast nozzle and tire fill hose.
1. Disconnect the air supply from the tire changer.
2. Disconnect the air line from the connection in-between the air regulator/filter and oiler (Fig. 84).
3. Plug the open connection on the regulator/filter/oiler assembly with the appropriate plug.
NOTE:
4. Using the appropriate adaptors for the shop, connect the nitrogen supply to the disconnected air line (Fig. 85).
5. Connect the air supply to the tire changer.
6. Check tire changer for proper operation.
DISCONNECT
THIS LINE
Either an 8mm air line plug such as McMaster-Carr part number
51615K194, or a piece of 5/16" x 1" rod (steel, brass, or plastic) will work for
plugging the open connection.
PLUG
Fig. 84
Fig. 85
28
NITROGEN
LINE
SHOP AIR

Advertisement

loading