Figure 12. Replacing The Controller Unit Bezel - IBM Netfinity FAStT500 Installation Manual

Raid controller
Table of Contents

Advertisement

To install the controller unit in a rack, perform the following steps.
1 Slide the controller unit into the rack and secure the rear of the controller unit with two
of the small screws that you removed in
Rear controller
unit screws
2 Secure the front of the controller unit with the other two screws.
3 To install the battery, controllers, and controller fan in the front of the controller unit,
reverse the instructions in
Note: If you are installing additional cache memory in a controller, you can install it
now, before you install the controller back in the controller unit. See
additional cache memory in a
4 To install the power supplies and fan and communications module in the back of the
controller unit, reverse the instructions in
5 To install the mini-hubs in the back of the controller unit, reverse the instructions in
Figure 11 on page
6 To replace the bezel, slide the top edge under the lip on the chassis; then, push the bezel
bottom until the pins snap into the mounting holes, as shown in
Controller unit
bezel
18
IBM Netfinity FAStT500 RAID Controller Enclosure Unit Installation Guide
Figure 8 on page 13
controller".
14.

Figure 12. Replacing the controller unit bezel

Step 8 on page
17.
and
Figure 9 on page
Figure 10 on page
14.
Front controller
unit screws
13.
"Installing
Figure
12.

Advertisement

Table of Contents
loading

Table of Contents