Test Base/Off/Platform Switch - Skyjack SJ63AJ Operating Manual

Articulating booms
Hide thumbs Also See for SJ63AJ:
Table of Contents

Advertisement

Section 2 - Familiarization
Base Control Console
Start/Function Enable/
Emergency Power Switch
To conserve battery power, test each
function through a partial cycle.
3. On base control console, pull out "
emergency stop button.
4. O n b a s e c o n t r o l c o n s o l e , t u r n
base/off/platform key switch to "
platform position.
5. Select "
from start/function enable/emergency
power switch and activate each boom
function.
Result: All selected functions should
operate.
6. Turn base/off/platform key switch to "
base position.
7. Select "
from start/function enable/emergency
power switch and activate each boom
function.
Result: All selected functions should
operate.
The
emergency
a three-minute duty cycle.
SJ 63AJ
It is the responsibility of the operator to read, completely understand and follow all instructions and warnings
NOTE
"
"
" emergency power position
"
" emergency power position
NOTE
power
unit
has
December 2007
contained in this operating manual and on the aerial platform.
Base/Off/Platform Key
Switch
Emergency
Stop

Test Base/Off/Platform Switch

1. Ensure both "
buttons are pulled out.
Result: Glow plug light should turn on and
turn off after a slight delay.
2. Start engine.
3. On base control console, turn base/off/
platform key switch to "
Result: Engine should shut down and
aerial platform functions should not
operate.
4. On base control console, turn base/off/
platform key switch to "
position.
WARNING
Ensure that you maintain three points
of contact to mount/dismount platform.
5. Enter platform and close gate.
6. On platform control console, select "
on position from engine enable switch.
Function Tests
" emergency stop
" off position.
" platform
"
Page 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents