Husqvarna CT 36 Series Operator's Manual page 31

Table of Contents

Advertisement

Operation
Continued from the previous page.
7. Connect the green wire to one of the throttle mounting screws.
8. Connect the yellow wire to the bottom of the kill switch (d).
9. Secure the wires to the handle with cable ties.
Installing the
1. Pull the pitch control cable (e) from the bottom end of the handle and remove
handle
the cable nut (f) from the pitch control cable.
2. Remove the two bolts (g) and two nuts from the bottom end of the handle.
3. Feed the pitch control cable through the top slot in the handle base (h).
4. Insert the handle into the handle base.
5. Feed the cable over the pulley (j) and out the bottom slot in the handle base.
6. Attach the handle to the handle base with the two bolts and nuts. Tighten the
nuts to 25 Nm (18 ft. lbs.).
7. Push the Pro-Shift
turn the pitch control knob (m) counterclockwise as far as possible.
8. Thread the pitch control cable through the fork (n) as shown.
This procedure continues on the next page.
g
j
e
f
®
handle (k) all the way forward (away from the operator) OR
m
32
Walk-Behind Trowels
h
n
k
wc_tx004127gb_FM10.fm
wc_gr014681
wc_gr014685

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents