MTS Systems 318 Series Product Information page 95

Load unit
Table of Contents

Advertisement

Prerequisite
Check the Precharge
Pressure
318 Load Unit
To prepare the accumulator for precharge check:
Accumulators are pressurized devices.
Pressurized accumulators and their parts can become lethal projectiles if
disassembled and can cause death to persons and/or damage to
equipment.
Do not remove an accumulator that is pressurized. Completely remove hydraulic
pressure and discharge the accumulator before any parts, except the protective
cover and valve stem cap, are removed.
1. Ensure that system hydraulic pressure has been reduced to zero before
proceeding. To do this, turn off the hydraulic power unit and exercise the
actuator until it stops moving.
2. Close the bleed valve on the accumulator charging kit. Remove the
protective cover and valve stem cap from the accumulator.
1. Connect the charging kit chuck valve to the accumulator valve stem.
Routine Maintenance Overview Checklist
WARNING
Maintenance
95

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

318.10318.25318.50

Table of Contents