Load Unit: Maintain Airmount Pressures - MTS Systems 318 Series Product Information

Load unit
Table of Contents

Advertisement

Routine Maintenance Overview Checklist

318 Load Unit: Maintain Airmount Pressures

83–86 mm
(3.25–3.5 in)
80
Maintenance
Optional inflatable airmounts reduce vibration and noise. They are installed
under the feet of the load unit. Inflation pressures must be maintained to both
level and isolate the load unit.
Airmounts can be overinflated and then explode.
You can be seriously hurt if an airmount explodes, sending fragments flying.
Do not overinflate the airmounts.
1. Check the inflation pressures on each airmount. Bleed any airmount whose
pressure is above 0.55 MPa (80 psi).
2. Check the airmounts' inflated heights. They should be between
83–86 mm (3.25–3.5 in).
If the load unit is level and the airmount heights correct, you are done.
If not, continue this procedure.
0.55 MPa
(80 psi)
Maximum pressure
3. Gradually inflate or deflate each airmount in 5 mm (0.20 in) steps as
required to level the load unit.
Ensure that airmount pressures do not rise above 0.55 MPa (80 psi) and
heights do not rise above 86 mm (3.5 in).
4. After leveling the load unit, check that the height of each airmount is
between 83–86 mm (3.25–3.5 in).
5. If any airmount pressures are above 80 psi (0.55 MPa) or any airmount
heights not between 83–86 mm (3.25–3.5 in), repeat Steps 1–3 until the load
unit is level.
WARNING
5 mm (0.20 in)
steps
318 Load Unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

318.10318.25318.50

Table of Contents