MTS Systems 318 Series Product Information page 53

Load unit
Table of Contents

Advertisement

318 Load Unit
C.
Once the load unit is upright, raise it slightly so that the pallet can be
removed.
Crane travel
Bringing the Load Unit Upright
Before you move the load unit, that:
The floor where the load unit will sit can bear its weight.
The path to where the load unit will sit is clear and uncluttered.
The area where the load unit will sit is clean and well lit, with all hoses
and cables moved out of harm's way.
The eyebolts are tight.
The crosshead is manually locked.
Lift the load unit only as high as necessary. Move it slowly to its installation
site.
5. Place the load unit onto the isolation pads or airmounts.
If your load unit has isolation pads, and the load unit does not sit level,
install stock metal shims between the pads and the floor.
°
30
maximum
Installation
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

318.10318.25318.50

Table of Contents