Renewing The Water - Astoria SABRINA SAE DISPLAY Use And Maintenance Manual, Instructions For The User

Hide thumbs Also See for SABRINA SAE DISPLAY:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 39
7.3.2 Version SAE DISPLAY
Press the main switch (1) of the machine;
wait a few seconds longer for the auto-test to be
carried out;
wait for the boiler to automatically fill with water and
for the machine to heat up;
the machine is ready for use when the following is
shown on the the display:
During the machine heating stage (approx. 20 minutes), the vacuum
regulator valve will release steam for several seconds until the valve
itself shuts off.
7.3.3 Switching the machine off
Switch the machine off through the switch or the
main selector.
USER manual

Renewing the water

7.4
During the installation of the machine, the Qualified
Technician must replace the water contained in the hy-
draulic circuits by following these steps:
when installation is complete, the appliance has to
be started, brought to the nominal working condi-
tion and left for 30 minutes in the "ready to operate"
condition;
afterwards, the appliance has to be turned off and
emptied of the first water introduced in the whole hy-
draulic circuit, to eliminate possible initial impurities;
following this, the equipment must be charged again
and taken to its nominal operating conditions;
After having reached the "ready for operation" status,
the following dispensing actions must be carried out:
- for each coffee unit, carry out a continuous deliv-
ery, in order to release at least 0.5 litres from the
coffee circuit. In the case of several dispensing
points matched with the same exchanger/coffee
boiler, divide the volume on the base of the num-
ber of the dispensing points;
- discharge the whole volume of hot water from the
boiler (6 litres for 2GR, 8 litres for 3GR, 11 litres for
4GR) continuously dispensing from the specific
spout. In case of multiple dispensing points, sub-
divide this volume according to the number of
dispensing points;
- continuously release steam for at least 1 minute
for each steam dispensing point.
If the machine remains inactive for a time longer than 1 week, the
Qualified Technician must renew 100% of the water contained in
the hydraulic circuit, as indicated above.
53
244
of

Advertisement

Table of Contents
loading

Table of Contents