Unpacking The SWXRA-Yx RAID Array 410 Subsystem

This chapter describes the site preparation and unpacking procedures for the SWXRA-Yx RAID Array 410
Subsystem.
1.1

Site Preparation

The SWXRA-Yx RAID Array 410 Subsystem is designed for installation in Federal
Communications Commission (FCC) Class A environments. Before installing the SWXRA-
Yx, make sure that adequate space is available in front of the enclosure for opening the front
door (19 inches clearance) and around the enclosure for adequate airflow. See Figure 1–1 for
specific space requirements.
Figure 1–1 Minimum Installation Clearance Measurements
EK–SMRA3–IG. C01
1
1–1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RAID Array 410 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents