Confirming The Ethernet Connection - Watts AERCO Benchmark BMK750 Installation And Start-Up Manual

Natural gas, propane gas and dual fuel modulating & condensing boilers with edge i controller
Hide thumbs Also See for AERCO Benchmark BMK750:
Table of Contents

Advertisement

Benchmark 750-6000 with Edge [i]: Install-Startup Manual
SECTION 3 – ONAER SETUP
Connecting The Ethernet Cable Instructions
USB JACK
ETHERNET JACK
Figure 3-1: Edge Controller – Left Side View

3.1.2 Confirming the Ethernet Connection

Refer to Figure 3-2, below, and complete the following instructions to confirm that the Ethernet
cable connection is working.
Confirming The Ethernet Connection Instructions
1. Powered the unit on and look for the green LED on the Controllers front face above the
onAER soft-key.
2. If the green LED is blinking periodically, there is normal communication with the network.
Figure 3-2: Edge Controller Front Face – Ethernet Indicator LED
OMM-144_B • GF-217 •
5/25/2020
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
GREEN
LED
Page 48 of 62

Advertisement

Table of Contents
loading

Table of Contents