Confirming The Ethernet Connection - Watts AERCO Benchmark BMK750 Installation And Start-Up Manual

Platinum boilers with edge [ii] controller
Hide thumbs Also See for AERCO Benchmark BMK750:
Table of Contents

Advertisement

Benchmark Platinum-Edge [ii]: Installation Manual
SECTION 3 – ONAER SETUP
Connecting the Ethernet Cable Instructions
ETHERNET
JACK
Figure 3-1: Edge Controller – Left Side View

3.1.2 Confirming the Ethernet Connection

Refer to Figure 3-2, below, and complete the following instructions to confirm that the Ethernet
cable connection is working.
Confirming the Ethernet Connection Instructions
1. Powered the unit on and look for the green LED on the Controllers front face above the
onAER soft-key.
2. If the green LED is blinking periodically, there is normal communication with the network.
Figure 3-2: Edge Controller Front Face – Ethernet Indicator LED
GF-210 •
OMM-136_G
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
8/20/2020
GREEN
LED
Page 48 of 62