Setting The Unit - Watts AERCO Benchmark BMK750 Installation And Start-Up Manual

Natural gas, propane gas and dual fuel modulating & condensing boilers with edge i controller
Hide thumbs Also See for AERCO Benchmark BMK750:
Table of Contents

Advertisement

Benchmark 750-6000 with Edge [i]: Install-Startup Manual
SECTION 2 – INSTALLATION
WARNING!
Keep the unit area clear and free from all combustible materials and flammable vapors or
.
liquids
FOR MASSACHUSETTS ONLY:
For Massachusetts installations, the unit must be installed by a plumber or gas-fitter licensed
within the Commonwealth of Massachusetts. In addition, the installation must comply with all
requirements specified in Section 1.4, above.

2.4.2 Setting the Unit

If anchoring the unit, refer to Figure 2-2a through 2-2d for anchor locations.
All holes are flush with the bottom surface of the frame.
All dimensions shown are in inches [millimeters]
Figure 2-2a: BMK750-1000 Anchor Bolt Locations
OMM-144_B • GF-217 •
5/25/2020
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 18 of 62

Advertisement

Table of Contents
loading

Table of Contents