Benchmark 750-6000 with Edge [i]: Install-Startup Manual
SECTION 2 – INSTALLATION
12V POWER
TRANSFORMER
Figure 2-9a: BMK750-1000 Power Box Internal Components
TRANSFORMER
24V POWER
SUPPLY
12V POWER
SUPPLY
FLAME ROD SIGNAL
AMPLIFIER
Figure 2-9b: BMK1500-2000 Power Box Internal Components
OMM-144_B • GF-217 •
FUSE BLOCKS (2)
SUPPLY
115V/24V
FUSE BLOCKS (2)
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
5/25/2020
POWER
BREAKER
TERMINAL BLOCKS
FLAME ROD SIGNAL
AMPLIFIER
24 V POWER SUPPLY
(SEQUENCING VALVE)
WIRE CONDUITS
TERMINAL BLOCKS
POWER
BREAKER
Page 35 of 62