Lifting Provisions; Bmk750 - 1000 Lifting Provisions - Watts AERCO Benchmark BMK750 Installation And Start-Up Manual

Natural gas, propane gas and dual fuel modulating & condensing boilers with edge i controller
Hide thumbs Also See for AERCO Benchmark BMK750:
Table of Contents

Advertisement

Benchmark 750-6000 with Edge [i]: Install-Startup Manual
SECTION 2 – INSTALLATION
Figure 2-2d: BMK4000-5000N Anchor Bolt Locations
Figure 2-2e. Benchmark 5000-6000 Anchor Bolt Locations

2.5 LIFTING PROVISIONS

WARNING!
When lifting or moving the boiler, DO NOT attempt to manipulate the boiler using the gas
train or blower.
2.5.1 BMK750 – 1000 Lifting Provisions
Unpack and inspect the unit, then remove the four (4) lag screws securing the boiler to the
shipping pallet. The boiler can be lifted and moved by inserting forklift tines in the front slots
provided in the base of the unit, or it can be lifted by attaching a lifting bar to the unit's heat
exchanger. A lifting bar (P/N 59174), with attaching hardware, is supplied with each unit. When
shipped, this bar is attached to the rear of the unit as shown in Figure 2-3a (View A). One (1)
lifting tab is provided at the top of the unit's heat exchanger as shown. This tab is used to attach
the lifting bar to the unit, as described below.
OMM-144_B • GF-217 •