Every Week - GENTILIN CLINIC 3.40 Series Instruction Manual

Table of Contents

Advertisement

Instruction Manual - Clinic 3.40 Compressors

EVERY WEEk

At the end of the workday, run the condensate drain of the tank, following
the steps below:
1) Place under the condensate drain valve, a col-
lection container fit for use.
2) Slowly open the valve of condensate drain (12)
and wait for a complete exit of compressed air
and condensate.
3) Close the drain valve.
4) Indicate the action on the maintenance card.
You muSt DISpoSE of tHE CoNDEN-
SatIoN LIQuID IN CompLIaNCE WItH
tHE REguLatIoNS IN foRCE IN tHE
CouNtRY of uSE.
12
CLINIC DRY 3.40 HS
MAN0340001 - 07/2019
12
CLINIC 3.40
12
CLINIC DRY 3.40 H
43
www.gentilinair.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clinic 3.40Clinic dry 3.40 hClinic dry 3.40 hs

Table of Contents