Timing Belt/Cr Motor Removal - Epson Perfection 3200 Photo Service Manual

Color image scanner
Hide thumbs Also See for Perfection 3200 Photo:
Table of Contents

Advertisement

EPSON Perfection 3200 Photo

4.2.8 Timing Belt/CR Motor Removal

1. Release the carriage lock. (See Section 4.2.1.)
2. Remove the document cover. (See Section 4.2.2.)
3. Remove the upper cover. (See Section 4.2.3.)
4. Remove the carriage unit. (See Section 4.2.5.)
5. Remove the two screws (CBS, M3x5) that are securing the CR motor unit.
(See Figure 4-24)
6. Disconnect the CR motor connector (CN7) and disengage the hook, and
then remove the CR motor unit. (See Figure 4-25)
1.Remove the flange pulley.
2.Remove the flat washer.
3.Remove idle pulley _A.
4.Remove the idle pulley.
5.Remove the drive pulley.
Pass the CR motor unit cable under the shield plate and
then connect it to the main circuit board.
Disassembly and Assembly
CR Motor
Connector
Hook
DISASSEMBLY AND ASSEMBLY
CBS Screws (3x5)
Tightening Torque : 6-8kgfcm
Figure 4-24. CR Motor Removal (1)
CR Motor Unit
Figure 4-25. CR Motor Removal (2)
Revision A
CR Motor Unit
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents