Spray height control system hardi europe autoheight dah or dah09 (7 pages)
Summary of Contents for Norac UC4.5
Page 1
Hardi OEM North America/Australia Trapeze Boom Installation Manual...
Page 2
Reorder P/N: UC4.5-BC-HD3-INST Rev C (Hardi OEM North America/Australia Trapeze Boom) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
Introduction Congratulations on your purchase of the NORAC UC4.5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
Page 8
Figure 4: HD3 Single Acting Hydraulic Plumbing...
Page 9
UC5 NETWORK 6 PIN PLUG 44963D VALVE BLOCK ASSEMBLY 2 STATION CC/LS PROP DT 4 BOLT Optional Main Lift Kit An optional main lift sensor kit is available for purchase from NORAC. Part Number Name 4570BC UC4.5 MAIN LIFT OPTION - 44743...
Page 10
P - PIPE Do not use high speed power tools/drills when installing hardware. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Existing System Check 1. Before beginning the install, ensure all hydraulic boom functions are operating properly on the sprayer. All Fold Functions Main Lift Function Wing Tilt Functions Slant Function 2. Inspect slide pads and wear surfaces for excessive wear. Replace or adjust if necessary. 3.
Page 12
8. Record the time (seconds) it takes for a full stroke for all boom functions. To ensure repeatable measurements, take the average of 3 trials. 9. Not all sprayers will have the functions listed below in Figure 6. Ensure the boom has sufficient travel so it does not contact the ground during these tests.
Ultrasonic Sensor Installation Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 7, following the instructions below. Figure 7: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
Page 14
Ultrasonic Sensor Serial Number Arrangement When installing the sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each sensor has a serial number stamped on the sensor housing. Apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Page 15
Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
Page 16
If the sensor is mounted to this portion of the boom, the system will force the boom downwards towards the ground as the boom folds backwards. 4. Mount the NORAC ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
Roll Sensor Installation Bracket Assembly 1. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine screws. Tighten screws to 10 in-lbs (1.1 Nm). 2. The orientation of the mounted roll sensor to the roll sensor bracket will depend on the bracket mounting.
Page 18
Temperature Probe Once the block is mounted, fasten the temperature probe from E03 to the NORAC valve block using the included 3/8x1/2” bolt as illustrated in Figure 14. Figure 14: NORAC Valve Block with Temperature Probe Installed...
Page 19
Figure 15: Chassis Roll Sensor Mounted on an FTZ Boom Figure 16: Boom Frame Roll Sensor Mounted on an FTZ Boom...
Page 20
Figure 17: Roll Sensors Mounted on an SPC Eagle Boom...
“RIGHT” or “CCW” is the white wire on C16. 6. Splice the NORAC wires in with the existing Brown HARDI wires. The HARDI wires are the upward most wires on the junction box as shown in Figure 19. This will provide a...
Page 22
8. Connect the 6-pin tower on C03 to the 6-pin shroud on C11. Connect the 2-pin connectors on C03 to the NORAC valve block, as shown in Figure 20. 9. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT DOWN and LEFT DOWN.
Page 23
10. Fasten the 8-way coupler to the boom with cable ties. Connect P6 on C11 to the 8-way coupler. 11. Connect both roll sensors to the 8-way coupler. 12. Connect two cables (C05) to the 8-way coupler and route along the booms to the wing sensors.
Valve Assembly – Double Acting 1. On a clean surface remove the plastic plugs from the block. 2. Install the 6MB 6MBSPP (HD1) fittings into the “P” and “T” ports on the NORAC block. Tighten to 18 ft-lbs (24 Nm).
Page 25
4. Install the 6MB 6MBSPP (HD1) fittings into the “B” ports on the NORAC block. Tighten to 18 ft-lbs (24 Nm). 5. Install the 6MBP (F03) plugs into the “A” ports on the NORAC block and tighten to 18 ft- lbs (24 Nm).
Page 26
Valve Block Mounting Ensure that no hydraulic components will interfere with any sprayer parts or be pulled tight at any time. The recommended mounting location is on the rear of the boom main section near the Hardi valve block. 1. A suitable mounting location for the valve block is illustrated in Figure 23. 2.
Page 27
1. After the NORAC valves are mounted, the hydraulic hoses and fittings can be plumbed following the schematic in Figure 3. 2. Attach 1/2 inch pressure ("P") and tank ("T") lines (HD3) to the NORAC valve block. Tee into the pressure and tank ports on the sprayer valve block using tee fittings (HD2).
4. By using the “Quick Install” feature of the UC4.5 panel, the system may be configured in preparation for the End-User. However, a hydraulic “ReTune” procedure will be required for optimal performance.
Page 37
TOPCON Agriculture Canada 3702 Kinnear Place Saskatoon, SK S7P 0A6 TOPCON Agriculture Americas W5527 Hwy 106 Fort Atkinson, WI 53538 TOPCON Precision Agriculture Europe Avenida de la industria, 35, Tres Cantos, España Spain Support Phone: 888 979 9509 E-mail: tasupportn@topcon.com Web: www.norac.ca...
Need help?
Do you have a question about the UC4.5 and is the answer not in the manual?
Questions and answers