Avaya S8100 Series Manual page 999

Media servers and gateways
Hide thumbs Also See for S8100 Series:
Table of Contents

Advertisement

Enabling CNC, if necessary
If the CNC status in
configured, do this procedure. Otherwise, go to
page 999.
If using Control Network C (CNC):
1. Use the PuTTY application to reaccess the server using the secure shell (SSH) protocol.
2. Log in as craft or dadmin.
3. Type cnc on. Press Enter.
Initializing Communication Manager
To initialize Communication Manager:
1. Use the PuTTY application to reaccess the server using the secure shell (SSH) protocol.
Note:
For the following step, the logons are release-dependent.
Note:
2. Log in as craft or dadmin.
3. Type stop -acf. Press Enter to stop Communication Manager.
Communication Manager might already be stopped in
on the first S8720 Media Server
4. Type server -b. Press Enter to queue a busy out of the Communication Manager
software.
The system responds with the following message
ACP not yet running, queueing busyout request.
5. Type start -ac. Press Enter to start Communication Manager and load the translations.
Performing an integrity check on the first S8720 Media Server
To perform an integrity check on the first S8720 Media Server:
1. On the Maintenance Web Interface, under Diagnostics, click Ping.
The system displays the Ping window.
Checking the CNC status
on page 991.
on page 957 is Control Network C was
Initializing Communication Manager
Stopping Communication Manager
On first S8720 Media Server
on
Issue 2.1 June 2006
999

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents