Rtd Service Kit - P/N 1028320; Replacing The Tank Rtd - Nordson ProBlue 1028303 Instruction Sheet

Adhesive melters
Table of Contents

Advertisement

Instruction Sheet

RTD Service Kit - P/N 1028320

Use this service kit to replace either the tank or the manifold RTD. The kit
contains a ceramic terminal block that must be installed the first time you
replace either RTD.

Replacing the Tank RTD

Terminal Block
RTD
Thermal Compound
O-ring
O-ring
WARNING: Risk of personal injury or equipment damage! Refer to
the safety information provided in the melter manual before servicing
the melter. Failure to comply with the safety information provided
can result in personal injury, including death.
1.
Switch the melter off.
2.
Cut the wires on the failed
RTD just behind the RTD and then
pull out the RTD.
3.
Attach the terminal block to the bracket
using the 3-mm hex-head screw and
matching lock washer.
4.
Strip the ends of the existing
RTD wires and then connect the
wires to the top terminals on the
terminal block. Tighten the terminal
screws.
5.
Coat the new RTD with
thermal compound and then insert the RTD into
the slot until it stops.
P/N 1029716A
Tools:
Wire cutters
Small flat-tip screwdriver
2.5-mm hex wrench
6-mm hex wrench (For manifold RTD only)
6.
Trim the new RTD wires
approximately 100 mm (4 in.) from
the RTD, strip the ends of the wires,
and then connect both wires to the
bottom terminals on the terminal
block. Tighten the terminal screws.

Advertisement

Table of Contents
loading

Table of Contents