Unpacking; Uncrating; Packaging Materials Disposal - 3M -Matic 800rf Instructions And Parts List

Random case sealer with accuglide 3 taping heads
Table of Contents

Advertisement

6-UNPACKING

6.1 Uncrating

The envelope attached to the shipping box contains
the uncrating instructions of the machine (Figure 6-1).
Cut straps. Cut out staple positions along the bottom
of the shipping box or remove staples with an
appropriate tool (Figure 6-2).
After cutting out or removing the staples, lift the
shipping box in order to clear the machine
(two persons required).
Figure 6-3
Transport the machine with a fork-lift truck to the oper-
ating position. Lift the pallet at the point indicated by
labels on the front, back, and right side of the machine
Figure 6-3 (weight of machine + pallet =
See Specifi cations).
800rf-NA
Figure 6-1
Figure 6-2
Removal of Pallet
Loosen and remove nuts and brackets using the
open end spanner supplied in the tool box (Figure 6-4).
Figure 6-4
A cardboard box is located under the machine body.
Retrieve the instruction manual for additional proce-
dures of the set up. The box also contains parts re-
moved for shipping, spare parts and tools.
Cut the stretch fi lm and remove the control board, the
guards panel and the accessories box.
6.2 Disposal of Packaging Materials
The 800rf package is composed of:
- Wooden pallet
- Cardboard shipping box
- Wooden supports
- Metal fi xing brackets
- PU foam protection
- PP plastic straps
- Dehydrating salts in bag
- Special bag of laminated polyester/aluminium/
- Polyethylene (sea freight package only)
- Polyethylene protective material
For the disposal of the above materials, please follow
the environmental directives or the law in your country.
16
2012 March

Advertisement

Table of Contents
loading

Table of Contents